| 首页 > 国外采购买家 > 国外采购买家 | |||
| Costs and Quotations of Compressors, Inter and Aftercoolers | |||
| 发布时间: 2024-6-28 浏览:58 | |||
|
发 布 人:todaytex 发布人电子邮件:QQ:1407106692 微信:1407106692 联系网址:http://www.todaytex.com |
|||
|
公司:Costs and Quotations of Compressors, Inter and Aftercoolers 国家:follow 联系人:follow 地址: Inquiry (采购产品): Costs and Quotations of Compressors, Inter and Aftercoolers Dear Sir, I am Shailaja.K, doing my M.Tech in Indian Institute of Technology, Kanpur, Uttar Pradesh, India.I am working on "Off-Shore Liquefied Natural Gas (LNG) plant design". I need the costs and quotations of compressors, inter and after coolers: Details: 1) Two stage centrifugal compressor with one inter-cooler and one after-cooler to increase the pressure of a gas mixture from 3.25 bar (At -39°C) to 48 bar (At 38°C).Total work requirement in the two-stage compression is 64 MW (85333.334 HP). Total cooling duty of inter and after coolers is 50.6 MW. Compression pressure ratio between stages is 3.843. Inter-cooler duty is 3.75 MW. After-cooler duty is 46.8 MW. Flow through both compressors, inter and after coolers is 208.4 kg/s (202.97 m3/min). Cooling medium in both inter and after coolers is water. Work required for first compressor is 28.14 MW (37519.9 HP). Work required for second compressor is 35.76 MW (47679.88 HP). Poly-tropic efficiency for both is 83.5%. Material of construction is Stainless steel(Type 316). Application is for Off-Shore LNG Plant. Initial Pressure=3.25bar; Initial Temperature=-39°C Stage1 Inter-cooler Stage2 After-cooler Pressure(bar) 12.489 12.489 48 48 Temperature °C 47.6 38 137.8 38 Flow Composition: Component Composition N2 0.14 CH4 0.35 C2H6 0.41 C3H8 0.1 2)One more Two-Stage Centrifugal Compressor:: Initial Pressure= 3.8 bar; Initial Temperature=34°C Stage1 Inter-cooler Stage2 After-cooler Pressure(bar) 9.143 9.143 22 22 Temperature °C 72.4 34 79 32 Total work requirement in the two-stage compression is 31.7 MW (42266.56 HP). Total cooling duty of inter and after coolers is 123MW. Flow through the first compressor and intercooler is 308.5 kg/s (2684.7 m3/min). Flow through the second compressor and after cooler is 227 kg/s (98.94 m3/min). Work required for the first compressor is 18.57 MW (24759.9 HP). Work required for the second compressor is 13.19 MW (17586.6 HP). Inter-cooler heat duty is 49.79 MW. After-cooler heat duty is 73.35 MW. Cooling medium in both inter and after coolers is water. Poly-tropic efficiency for both compressors is 83.5%. Construction material is Stainless steel(Type 316). Flow Composition through first compressor and intercooler: Component Composition CH4 0.01 C2H6 0.47 C3H8 0.06 n-C4H10 0.3 i-C4H10 0.16 Flow Composition through second compressor and after cooler: Component Composition CH4 0.0126 C2H6 0.559 C3H8 0.0626 n-C4H10 0.23 i-C4H10 0.136 Kindly provide me the approximate costs of those and quotation of the equipment which will help me in estimating the total plant cost. This offer is not for fabrication as I am in the process of completion of my thesis work. Your help will be acknowledged. Thanking You Sir. [hide]联系方式:[/hide] Shailaja Kanne Room No:D-210; GH-1; IITK, UP. Room No:D-209; GH-1; IITK, UP. Kanpur, IN 208016 IND Company: IITK,Educational Institute Phone: 91-512-9793808783 E-mail: venu@iitk.ac.in [hide]邮箱:[/hide] venu@iitk.ac.in 电话:above 传真: above 采购本类产品及:above |
|||