| 首页 > 国际采购买家 > 国际采购买家 | |||
| information on cooling tower for alcoa warrick operations | |||
| 发布时间: 2024-6-28 浏览:53 | |||
|
发 布 人:todaytex 发布人电子邮件:QQ:1407106692 微信:1407106692 联系网址:http://www.todaytex.com |
|||
|
公司:information on cooling tower for alcoa warrick operations 国家:follow 联系人:follow 地址: Inquiry (采购产品): information on cooling tower for alcoa warrick operations This message is for D Pate. I'm looking for information pertaining to the cooling tower replacement project at Alcoa's Warrick Operations. I work for a consulting firm in Evansville and will be contracted by Alcoa to design the electrical installation and demolition job packages for this project. Thanks, Tom Guth [hide]联系方式:[/hide] Tom Guth 47716 Company: Project Associates E-mail: tguth@projectassociatesinc.com [hide]邮箱:[/hide] tguth@projectassociatesinc.com 电话:above 传真: above 采购本类产品及:above |
|||